- #01Plan and document coordination
Obvious clerical, title-block, sheet-index, permit-description, or cross-sheet inconsistencies visible in the submitted documents. A Courtesy Comment on these items does not cause FCC to fail or return the plan set unless the same condition also creates a building-code compliance issue within FCC's review scope.
FBC-B 107.2.1 - #02Zoning and site coordination
Apparent setback, lot-coverage, use, or site-dimension conflicts visible in the submitted plans that could cause the plans to fail Planning and Zoning review. Planning and Zoning makes the zoning and lot-compliance determination. The absence of a Courtesy Comment is not approval of those separate requirements.
- #03Floodplain coordination
Apparent inconsistencies or missing coordination in flood-zone, design-flood-elevation, finished-floor, or flood-opening information shown on the plans that could cause the plans to fail floodplain review. The floodplain administrator makes the determination. The absence of a Courtesy Comment is not approval of those separate requirements.
- #04Fire-authority coordination
Apparent separately reviewed fire alarm, sprinkler, hood-suppression, smoke-control, or similar coordination issues visible on the plans that could cause the plans to fail fire review. The fire marshal makes the determination. The absence of a Courtesy Comment is not approval of those separate requirements.
Multi Family Structural Elevation
House lifting, foundation lifting
Last updated: Apr 20, 2026
Section 1
Required Documents
Submit these with your initial project package.
Always required
- Construction Plans Sealed by a Florida Registered Design ProfessionalStructural engineering plans sealed by a Florida-registered professional engineer showing the elevation design
- Survey / Site PlanCurrent survey or site plan showing existing and proposed elevations
Conditional
- Elevation CertificateFEMA Elevation CertificateWhenRequired if property is located in a flood zone
- NOAs / Product ApprovalsNOAs and/or Florida Product Approvals for applicable components.WhenRequired if scope includes products/components requiring NOA or Florida Product Approval.
Courtesy screen
Courtesy screen on every plan review
Every plan FCC reviews receives a limited courtesy screen for the items below when they are reasonably visible in the submitted documents. If we see an apparent issue that could cause the plans to fail review by another agency, we will identify it as a Courtesy Comment. Courtesy Comments alone do not cause FCC to fail or return the plan set unless the same condition also creates a building-code compliance issue within FCC's review scope. The responsible agency makes the final determination—for example, Planning and Zoning for setbacks, lot coverage, use, and other lot-compliance matters. The absence of a Courtesy Comment is not approval of those separate requirements.
Section 2
Approval criteria for this project type
These are the building-code criteria FCC uses to determine the plan-review result. An unresolved item may be issued as a Required Correction and cause the plan set to be returned for correction.
BuildingRequired
- #01Design wind speed & exposureLife Safety
Structural drawings must declare design wind speed (Vult) and exposure category matching the jurisdiction's wind speed map.
FBC-R R301.2.1ASCE 7-22 - #02Footing / foundation designLife Safety
Footing or foundation design must show dimensions, reinforcement, depth, and connection to the structure above.
FBC-R R403FBC-B 1809 - #03Elevation design and lateral anchorageLife Safety
Elevated foundation system must be designed for wind, seismic, and flood-loading with continuous lateral-force path.
ASCE 24FBC-B 1612FBC-R R322 - #04Engineer of record sealDocumentation
Structural drawings must bear a current Florida-licensed engineer's seal and signature.
Florida Statutes Chapter 471FBC-B 107.3.5
Section 3
Inspection Walkthrough
Inspections are listed in their typical phase order. Your FCC inspector will confirm which apply to your project. Call (772) 222-6679 with questions.
Building
Rough Framing
Conditional- Wall stud spacing and sizeCritical
Verify stud size and spacing match approved plans
FBC-R R602.3FBC-R R602.3.1 - Headers and beamsCritical
Verify header and beam sizes over openings per plans
FBC-R R602.7 - Top and bottom plate connectionsCritical
Verify double top plates with proper lapping and anchored bottom plates
FBC-R R602.3.2 - Corner and intersection bracingCritical
Verify proper bracing at corners and wall intersections
FBC-R R602.10 - Window and door rough openingsCritical
Verify rough openings match approved plans for size and location
FBC-R R602.7 - Hurricane straps and hold-downsCritical
Verify hurricane straps and hold-down hardware installed per plans
FBC-R R802.11 - Fire blocking
Verify fire blocking is installed at required locations
FBC-R R602.8
Roof Dry In, In Progress
Conditional- Underlayment installationCritical
Verify roof underlayment is installed per code and manufacturer specs
FBC-R R905.1.1 - Drip edge installationCritical
Verify drip edge is installed at eaves and rakes
FBC-R R905.2.8.5 - Valley and flashingCritical
Verify valley flashing and wall flashing are properly installed
FBC-R R903.2 - Roof penetration sealing
Verify all roof penetrations are properly sealed and flashed
FBC-R R903.2
Plumbing
Rough Plumbing
Conditional- Supply pipe sizing and materialCritical
Verify supply pipe sizes and material match approved plans
FBC-P 604.1 - DWV pipe sizing and slopeCritical
Verify drain, waste, and vent pipe sizes and slope per plans
FBC-P 704.1 - Pipe support and hangingCritical
Verify pipes are properly supported at required intervals
FBC-P 308.1 - Vent termination locations
Verify vent pipes terminate properly through roof
FBC-P 903.1 - Water heater rough-in
Verify water heater location, drain pan, and connections per plans
FBC-P 607.1
Electrical
Rough Electrical
Conditional- Panel installationCritical
Verify electrical panel is properly mounted and sized per plans
NEC 408.4 - Wire sizing per circuitsCritical
Verify wire gauge matches breaker amperage for each circuit
NEC 210.3NEC 240.4 - Box fill and installationCritical
Verify electrical boxes are properly installed and not overfilled
NEC 314.16 - GFCI and AFCI locationsCritical
Verify GFCI and AFCI protection is provided where required
NEC 210.8NEC 210.12 - Smoke and CO alarm wiringCritical
Verify interconnected smoke and CO alarm wiring is in place
FBC-R R314.3FBC-R R315 - Grounding and bondingCritical
Verify grounding electrode system and bonding connections
NEC 250.50
Mechanical
Rough Mechanical/HVAC
Conditional- Ductwork installationCritical
Verify duct sizes, routing, and support match approved plans
FBC-M 603.1 - Duct sealingCritical
Verify duct joints and connections are properly sealed
FBC-M 603.9 - Equipment placementCritical
Verify air handler and condenser locations per plans with required clearances
FBC-M 304.1 - Refrigerant line installation
Verify refrigerant line sizing and insulation per plans
FBC-M 1101.3 - Return air pathway
Verify return air pathways are properly sized and located
FBC-M 601.2
Building
Insulation
Conditional- Wall cavity insulation R-valueCritical
Verify wall insulation R-value matches energy calculations
FBC-E R402.1 - Ceiling/attic insulation R-valueCritical
Verify ceiling or attic insulation R-value per energy calculations
FBC-E R402.1 - Insulation coverage and gapsCritical
Verify no gaps, voids, or compression in insulation installation
FBC-E R402.4 - Air sealing
Verify air sealing at penetrations, top plates, and rim joists
FBC-E R402.4.1
Lathe, Siding
Conditional- Wall covering material and installationCritical
Verify exterior wall covering material matches approved plans and is properly installed
FBC-R R703.1 - Weather-resistive barrierCritical
Verify weather-resistive barrier is properly installed behind cladding
FBC-R R703.2 - Flashing at penetrations and transitionsCritical
Verify flashing is installed at windows, doors, and wall transitions
FBC-R R703.4 - Fastener pattern and spacing
Verify cladding fastener type and spacing per manufacturer and plans
FBC-R R703.1
Drywall
ConditionalBD-DependentMost jurisdictions skip this inspection for this project type. Confirm with your building department whether they'll require it.
- Drywall thickness and typeCritical
Verify drywall thickness matches plans, moisture-resistant board in wet areas
FBC-R R702.3.1 - Fastener spacingCritical
Verify screw or nail spacing meets code requirements
FBC-R R702.3.5 - Fire-rated assembliesCritical
Verify fire-rated walls and ceilings have proper drywall layers per rating
FBC-R R302.6 - Moisture barrier in wet areas
Verify moisture barrier behind tub/shower surrounds where required
FBC-R R702.4
Electrical
Final Electrical
RequiredTypical Final- Panel complete and labeledCritical
Verify panel cover installed, all breakers labeled, no open knockouts
NEC 408.4 - GFCI and AFCI operationalCritical
Verify all GFCI and AFCI devices test and reset properly
NEC 210.8NEC 210.12 - Receptacle and switch functionCritical
Verify outlets and switches operate correctly throughout
NEC 210.52 - Light fixtures installed
Verify all light fixtures are installed and operational
NEC 210.70 - Exterior lighting and outletsCritical
Verify exterior outlets are GFCI protected and lighting is functional
NEC 210.8NEC 210.52(E)
Plumbing
Final Plumbing
RequiredTypical Final- Fixture installation and operationCritical
Verify all plumbing fixtures are installed, connected, and operational
FBC-P 405.1 - Water heater installationCritical
Verify water heater is properly installed with TPR valve, drain pan, and discharge pipe
FBC-P 607.1 - No visible leaksCritical
Verify no leaks at any supply or drain connection
FBC-P 312.1 - Hose bibbs and exterior plumbing
Verify exterior hose bibbs have backflow prevention
FBC-P 608.15.4.2
Mechanical
Final Mechanical/HVAC
RequiredTypical Final- System operational testCritical
Verify HVAC system starts, runs, and produces heated and cooled air
FBC-M 304.1 - Air handler and condenser installationCritical
Verify equipment is properly installed with required clearances and level
FBC-M 304.1 - Condensate drainCritical
Verify condensate drain is properly routed and terminated
FBC-M 307.2 - Duct registers and grilles
Verify all supply and return registers are installed and operational
FBC-M 601.2 - Equipment labels and data plates
Verify equipment nameplates match approved plans for capacity and efficiency
FBC-M 304.1
Building
Final Building
RequiredTypical Final- Egress doors and hardwareCritical
Verify egress doors provide minimum 32-inch clear width and proper hardware
FBC-R R311.2 - Smoke alarms installed and operationalCritical
Verify smoke alarms in each bedroom, outside sleeping areas, and each level
FBC-R R314.3 - CO alarms installedCritical
Verify carbon monoxide alarms where required
FBC-R R315 - Emergency escape openingsCritical
Verify bedroom windows meet egress size requirements
FBC-R R310.1 - Stairway complianceCritical
Verify stair rise, run, handrail height, and landing dimensions
FBC-R R311.7 - Address numbers visible
Verify address numbers are posted and visible from street
FBC-R R319.1 - Exterior finishes complete
Verify exterior cladding, trim, and weatherproofing are complete
FBC-R R703.1 - Site grading and drainage
Verify finish grade slopes away from foundation minimum 6 inches in 10 feet
FBC-R R401.3