Generators & EV chargers

Generators finaled before the next storm

Single-trade reviews come back in minutes, and finals run from the job site in the myFCC app the moment the install is done. When hurricane season fills your schedule, the county's inspection backlog is not your problem. You still file the permit and NTBO.

Freedom Code ComplianceSample

Plan Review Report

Royal Palm Generator · Single Family Generator Install

Project

Address
4402 SW Royal Palm Dr, Port St. Lucie, FL
Building department
City of Port St. Lucie
Permit
ELEC-26-02417

Design criteria

Building code
Plans: FBC 8th Edition (2023), NEC 2020
Checked: Edition in effect
Flood zone
Plans: Zone X
Checked: FEMA Zone X, minimal flood hazard

Documents and seals

Address and scope on every sheet match the project.

What we verified

  • Generator disconnect, transfer switch and labelingNEC 445, NEC 702
  • Grounding and bondingNEC 250

Courtesy comments

None on this plan set.

PRR-ELEC-26-02417 · Oct 1, 2026
Sample report for a fictional project. Result: Pass.

Pricing

Standard prices

FCC's published price for each permit. Building department permit fees are separate: FCC does not set, quote, or collect them.

Volume pricing is available for contractors at scale.

Talk to sales
  • Generator

    Plan review
    $200
    Inspections + COC
    $350
  • EV charger

    Plan review
    $100
    Inspections + COC
    $250

Sound familiar?

  • Separate electrical, mechanical and gas finals, each with its own queue
  • Post-hurricane surges that book departments out for weeks
  • Transfer-switch details flagged at the final instead of in review
  • EV charger installs waiting on an electrical final

Generators & EV chargers

What changes the day you switch

  • Every permit in one place

    Submit plans, request inspections and track every project in myFCC, on your phone or desktop.

  • No scheduling

    Request when the work is ready and a licensed inspector joins in minutes.

  • One office, every brand

    An organization login sees and manages every company and branch under it, so one office can run permitting for several brands.

Every project in one place

Submit plans, request inspections and track every project in myFCC, on your phone or desktop.

Check Out myFCC

Generators & EV chargers

Common projects

Same plan set, same inspection list, many permits a month.

  • Standby Generator Installs
  • Automatic Transfer Switches
  • LP and Natural Gas Fuel Line Connections
  • Portable Generator Inlet Boxes
  • EV Charger Installs

Single-trade plan review

Minutes

Single-trade plan reviews typically come back in minutes. Single-family projects take hours. Live and offline inspection results come back in minutes too.

Apply now

Measured on our platform7-day average · Oct 13 – Oct 19

Request to live inspector
3 min 24 sec
Offline request to result
13 min
Plan review in workable business hours, start to approved plans
2.6 hrs
Workable time is the time our team can act on your plans during business hours (weekdays 9–5, Fridays 9–4 ET). It’s how long a compliant submission with no blockers takes us to review and approve within business hours. Time waiting on you, like corrections or a quote out for approval, isn’t counted.

No scheduling required. You simply request the inspection when the work is ready. Live inspection requests are taken Monday to Friday, 9 am to 4:30 pm ET; offline inspections can be submitted any time.

FAQ

Generators & EV chargers: FAQs

What Florida Building Code sections apply to a generator install?

Standby generator installs in Florida typically hit three FBC chapters at once. The electrical interconnection and transfer switch fall under FBC-Electrical (referencing the current NEC edition adopted by the state). The unit itself and its combustion-air and exhaust provisions fall under FBC-Mechanical. The LP or natural gas line falls under FBC-Fuel Gas. Freedom Code Compliance verifies all three on the final. Wind-zone anchoring of the concrete pad is checked against the local wind speed map and any engineered anchor detail.

How fast are generator inspection results?

Live video inspections through myFCC Mobile match contractors with a licensed inspector in minutes and return results before the call ends, which can help the crew close out the install before leaving the site. Offline inspections, with GPS-tagged and timestamped photos of the transfer switch, fuel line, and anchored pad, are typically reviewed and returned within minutes during normal business hours.

Can FCC handle the electrical review for my EV charger or generator permit?

Yes. We review EV charger installations, transfer switches, standby generator connections, and battery storage electrical systems. Our plan reviewers understand the specific NEC articles and Florida code amendments that apply to these systems.

Do you offer volume pricing?

Yes. Volume pricing is available for contractors at scale. Talk to sales and tell us how many permits you run a month.

Built for builders who do not wait.