Repeat commercial new construction
Your next location approved in days, not weeks
Most commercial plan reviews take 1–2 days, so every new site moves on your schedule instead of sitting in the public queue. Built for chains that put up the same building at site after site. New construction only, not threshold buildings or hotels. You still file the permit and NTBO.
- Commercial reviews
- 1–2 Days
- Offline inspections
- Minutes
- Florida counties
- 55
- HB 803 minimum reductions
- 25% / 50%
Plan Review Report
Harbor Point Restaurant · Commercial New Building
Project
- Address
- 900 SE Harbor Point Blvd, Stuart, FL
- Building department
- City of Stuart
- Permit
- COM-26-00618
Design criteria
On the plans
Checked against
- Building code
- Plans: FBC 8th Edition (2023), NEC 2020
- Checked: Edition in effect
- Wind speed (Vult)
- Plans: 165 mph
- Checked: 162 mph at this site, Risk Category II
- Risk category
- Plans: II
- Checked: Assembly occupancy, restaurant
- Flood zone
- Plans: Zone X
- Checked: FEMA Zone X, minimal flood hazard
Documents and seals
Sealed by the engineer of record; digital signature intact.
What we verified
- Occupancy classificationFBC-B 302, FBC-EB 1001
- Design wind speed and exposureFBC-B 1609, ASCE 7-22
- Means of egress capacityFBC-B 1004, FBC-B 1005, FBC-B 1006, FBC-B 1017
- Fire protection systemsFBC-B 903, FBC-B 907, FBC-B 1008
- Specialty exhaustFBC-M 502.7, FBC-M 502.8, FBC-M 507
- Service size and load calculationNEC 220, NEC 230
Courtesy comments
None on this plan set.
Pricing
Priced per project
FCC quotes this work per project. Building department permit fees are separate: FCC does not set, quote, or collect them.
Volume pricing is available for contractors at scale.
Talk to salesCommercial new building
Priced per project.
Sound familiar?
- The same prototype plan set waiting in a new queue at every location
- Plan review queues delaying site mobilization on each new site
- Inspection coordination across trades and subcontractors at several sites at once
- Carrying costs adding up while each site waits on review and inspection windows
Repeat commercial new construction
What changes the day you switch
Commercial Review Speed
Most commercial plan reviews take 1–2 days, with revision cycles prioritized to protect project schedules.
One office, every brand
An organization login sees and manages every company and branch under it, so one office can run permitting for several brands.
Commercial Fee Reductions
For commercial projects, F.S. 553.791(2)(d) requires at least a 25% reduction of the plan-review or inspection portion of the permit fee, and at least 50% when the private provider performs all required services.
Every project in one place
Submit plans, request inspections and track every project in myFCC, on your phone or desktop.
Check Out myFCCRepeat commercial new construction
Common projects
Same plan set, same inspection list, many permits a month.
Commercial New Building Construction
ground-up restaurant, retail, office, and warehouse buildings, built from the same plans at many sites (A-2, B, M, S-1 under FBC-Building Chapter 3)
Repeat build examples
- Restaurant Chain Locations
- Retail Prototypes
- Office Buildings
- Warehouse & Distribution Facilities
Commercial Plan Review Turnaround
1–2 Days
Most commercial plan reviews take 1–2 days. Live virtual inspections return results during the call, and eligible offline inspections typically return within minutes.
Apply nowMeasured on our platform7-day average · Oct 12 – Oct 18
- Request to live inspector
- Offline request to result
- Plan review in workable business hours, start to approved plans
- Workable time is the time our team can act on your plans during business hours (weekdays 9–5, Fridays 9–4 ET). It’s how long a compliant submission with no blockers takes us to review and approve within business hours. Time waiting on you, like corrections or a quote out for approval, isn’t counted.
No scheduling required. You simply request the inspection when the work is ready. Live inspection requests are taken Monday to Friday, 9 am to 4:30 pm ET; offline inspections can be submitted any time.
FAQ
Repeat commercial new construction: FAQs
What commercial work does FCC take?
Repeat commercial new construction: the same building at site after site, such as restaurant chains. FCC does not take threshold buildings or hotels.
What occupancy classifications does FCC handle?
FCC reviews Commercial New Building Construction projects across A-2 (restaurants, assembly), B (business/office), M (mercantile/retail), S-1 (moderate-hazard storage and warehouse), F-1 (moderate-hazard factory and industrial), and mixed-use under FBC-Building Chapter 3. Occupancy classification drives downstream requirements for Chapter 5 area/height, Chapter 7 fire-resistance ratings, Chapter 9 sprinkler thresholds, and Chapter 10 egress.
How fast are commercial plan reviews with FCC?
Most commercial plan reviews take 1–2 days, with revision reviews prioritized to keep the job moving.
Can commercial builders use a private provider in Florida?
Yes. F.S. 553.791 lets the fee owner, or the owner's contractor with the owner's explicit written authorization, choose a private provider for plan review and inspection services on qualifying projects. That gives commercial builders a lawful way to reduce dependency on local building department queues while keeping permit review and inspections moving.
Is Freedom Code Compliance a permit expediter?
No. FCC is a private provider, not a permit expediter. We do not replace your permit runner or filing consultant. We speed up the technical review and inspection work that often creates the biggest delay on commercial projects.
Can FCC work alongside my permit expediter or expediting consultant?
Yes. Many commercial teams already have a permit expediter, architect, or expediting consultant managing submissions and municipal coordination. FCC fits into that process by delivering private-provider plan reviews and inspections so your expediting team is not waiting on slow public review cycles.
Do virtual inspections work for commercial construction projects?
Yes, when the scope is eligible for private-provider inspection and the inspection can be documented correctly. FCC offers live virtual inspections with results during the call and offline photo-based inspections with results typically returned within minutes.
Does FCC pull permits or file permit applications for commercial builders?
No. FCC does not pull permits or act as your filing agent. Your contractor, design team, owner representative, or permit expediter still handles permit application logistics. FCC handles the private-provider plan review and inspection scope.
How do the 2026 private-provider fee updates affect commercial builders in Florida?
For commercial projects, F.S. 553.791(2)(d) (HB 803, effective July 1, 2026) requires at least a 25% reduction of the plan-review or inspection portion of the permit fee, and at least a 50% reduction when the private provider performs all required plan review and inspection services.
Do you offer volume pricing?
Yes. Volume pricing is available for contractors at scale. Talk to sales and tell us how many permits you run a month.
Resources


