Re-Pipe Contractors

Virtual Inspections for Re-Pipe Contractors in Florida

A whole-house re-pipe is a one-day job for the crew and a three-week job for the permit — unless the inspection path is fixed. Freedom Code Compliance (FCC) performs virtual rough-in and final inspections for Florida re-pipe projects under Florida Statute 553.791, covering CPVC, PEX, and copper repipes in single-family, multifamily, and commercial properties. Most re-pipe permits are plumbing-only and do not require stamped plans.

Freedom Code ComplianceSample

Inspection Report

Banyan Court Re-Pipe · Single Family Re-Pipe

Project

Address
376 SW Banyan Ct, Port St. Lucie, FL
Building department
City of Port St. Lucie
Permit
PLB-26-01206

Inspection

Inspection
Plumbing Rough-In
Mode
Live video
Inspector
FCC licensed inspector

What we verified

  • Supply pipe sizing and materialFBC-P 604.3, FBC-P 605.4
  • Pipe support and hangingFBC-P 308.1

Evidence

Recorded live call and 7 time-stamped photos.

IR-PLB-26-01206 · Oct 1, 2026
Sample report for a fictional project. Result: Pass.

We solve your biggest challenges

  • Homeowners living without water while the re-pipe sits waiting on a building-department rough-in inspector
  • Drywall crews idling because the pressure test cannot be witnessed for three days
  • Multifamily re-pipes with dozens of units getting stuck on sequential unit-by-unit inspections
  • Material-specific installation details (PEX bend radius, CPVC solvent cure, copper fitting) failing on vague inspection comments

Re-Pipe Contractors

Built-in speed tools for every permit

  • Fast Code Review Workflows

    Keep permit packages moving with plan review workflows designed for speed, consistency, and clear correction cycles.

  • AI-Assisted Plan Reviews

    FCC uses software-assisted checks on single-trade plan reviews, with plans examiners completing each review.

  • Virtual Inspections On Demand

    Request virtual inspections whenever your crew is ready and keep projects moving without waiting on site visits.

Every project in one place

Submit plans, request inspections and track every project in myFCC, on your phone or desktop.

Check Out myFCC

Projects

Common re-pipe contractors projects

We have experience with thousands of re-pipe contractors projects across Florida.

  • Single-Family Whole-House CPVC Repipes
  • Single-Family PEX Repipes
  • Copper Line Repipes and Replacements
  • Multifamily Unit-by-Unit Repipes
  • Commercial Tenant-Space Domestic Water Repipes
  • Slab-Leak-Driven Repipes

Single-trade plan review

Minutes

Single-trade plan reviews typically come back in minutes. Single-family projects take hours and commercial projects 1–2 days. Live and offline inspection results come back in minutes too.

Apply now

Measured on our platform7-day average · Oct 7 – Oct 13

Request to live inspector
1 min 38 sec
Offline request to result
14 min
Plan review in workable business hours, start to approved plans
1.1 hrs
Workable time is the time our team can act on your plans during business hours (weekdays 9–5, Fridays 9–4 ET). It’s how long a compliant submission with no blockers takes us to review and approve within business hours. Time waiting on you, like corrections or a quote out for approval, isn’t counted.

No scheduling required. You simply request the inspection when the work is ready. Live inspection requests are taken Monday to Friday, 9 am to 4:30 pm ET; offline inspections can be submitted any time.

FAQ

Re-Pipe Contractors FAQs

Do re-pipe permits need plan review with FCC?

Typically no. Most Florida re-pipe permits — single-family and standard multifamily — are plumbing-only inspection permits and do not require stamped plans. Freedom Code Compliance performs the virtual rough-in pressure test and the virtual final. Plan review may come into play on larger commercial re-pipes, material changes that affect fixture unit load, or jurisdictions that require a plumbing riser diagram for multifamily. FCC handles the review when required and the inspection either way. FCC does not pull the permit or file the NTBO.

How does FCC handle CPVC, PEX, and copper verification on a virtual inspection?

Freedom Code Compliance verifies the re-pipe against the current Florida Building Code – Plumbing requirements for the specified material. On CPVC, that means verifying proper solvent-cement joints, support spacing, and that the system has been given the correct cure time before pressure testing. On PEX, that includes manufacturer-specific fitting type, bend radius, and support spacing. On copper, that includes fitting type, support, and proper isolation from dissimilar metals. The pressure test itself is witnessed live through myFCC Mobile or documented through GPS-tagged photo and video submissions.

How fast are virtual re-pipe inspection results?

Live video rough-in inspections through myFCC Mobile return results before the call ends, which can help the drywall crew avoid losing the day waiting on a witness. Offline inspections — with pressure-gauge photos, timestamped media, and clear shots of fittings, supports, and material transitions — are typically reviewed and returned within minutes during normal business hours. Re-pipe permits rarely involve plan review with Freedom Code Compliance, so on most jobs the only clock that matters is the inspection clock.

Built for builders who do not wait.