- #01Plan and document coordination
Obvious clerical, title-block, sheet-index, permit-description, or cross-sheet inconsistencies visible in the submitted documents. A Courtesy Comment on these items does not cause FCC to fail or return the plan set unless the same condition also creates a building-code compliance issue within FCC's review scope.
FBC-B 107.2.1 - #02Zoning and site coordination
Apparent setback, lot-coverage, use, or site-dimension conflicts visible in the submitted plans that could cause the plans to fail Planning and Zoning review. Planning and Zoning makes the zoning and lot-compliance determination. The absence of a Courtesy Comment is not approval of those separate requirements.
- #03Floodplain coordination
Apparent inconsistencies or missing coordination in flood-zone, design-flood-elevation, finished-floor, or flood-opening information shown on the plans that could cause the plans to fail floodplain review. The floodplain administrator makes the determination. The absence of a Courtesy Comment is not approval of those separate requirements.
- #04Fire-authority coordination
Apparent separately reviewed fire alarm, sprinkler, hood-suppression, smoke-control, or similar coordination issues visible on the plans that could cause the plans to fail fire review. The fire marshal makes the determination. The absence of a Courtesy Comment is not approval of those separate requirements.
Commercial New Building
New nonresidential building such as an office, hotel, school, medical facility, or storefront. Use New Apartment or New Condo for multifamily housing.
Last updated: Sep 29, 2026
Section 1
Required Documents
Submit these with your initial project package.
Always required
- Construction PlansConstruction plans for the building. Plans prepared by a Florida-registered architect or engineer carry that professional's seal. Plans prepared by a contractor or owner are accepted without a seal unless Florida law or the building department requires professional plans.
- Energy Compliance FormsEnergy compliance documentation per FBC Chapter 13 / IECC / ASHRAE 90.1
- Product ApprovalsFlorida Product Approvals for regulated building components
- Site Plan / SurveyCurrent site plan or survey showing property boundaries, setbacks, and building footprint
Conditional
- Truss Engineering OR Truss Deferral AffidavitTruss engineering package, conventional framing per FBC, or a truss deferral letter requesting deferred submittal of truss engineering.WhenRequired only when structure uses pre-engineered trusses and truss engineering is not shown in the plan set; satisfied by truss engineering in plan set OR conventional framing per FBC OR a truss deferral letter.
Courtesy screen
Courtesy screen on every plan review
Every plan FCC reviews receives a limited courtesy screen for the items below when they are reasonably visible in the submitted documents. If we see an apparent issue that could cause the plans to fail review by another agency, we will identify it as a Courtesy Comment. Courtesy Comments alone do not cause FCC to fail or return the plan set unless the same condition also creates a building-code compliance issue within FCC's review scope. The responsible agency makes the final determination—for example, Planning and Zoning for setbacks, lot coverage, use, and other lot-compliance matters. The absence of a Courtesy Comment is not approval of those separate requirements.
Section 2
Approval criteria for this project type
These are the building-code criteria FCC uses to determine the plan-review result. An unresolved item may be issued as a Required Correction and cause the plan set to be returned for correction.
BuildingRequired
- #01Occupancy classificationLife Safety
Occupancy group must be clearly stated. Any change of occupancy requires FBC-EB 1001 compliance path.
FBC-B 302FBC-EB 1001 - #02Fire protection systemsLife Safety
Sprinkler coverage, alarm coverage, and emergency egress lighting required per occupancy.
FBC-B 903FBC-B 907FBC-B 1008 - #03Means of egress capacityLife Safety
Occupant load, egress width, travel distance, and number of exits must comply with FBC-B Ch. 10.
FBC-B 1004FBC-B 1005FBC-B 1006FBC-B 1017 - #04Design wind speed & exposureLife Safety
Structural drawings must declare design wind speed (Vult) and exposure category matching the jurisdiction's wind speed map.
FBC-B 1609ASCE 7-22 - #05Structural wall section and load pathLife Safety
A continuous wall section from foundation through roof must show framing, sheathing, connectors, and uplift resistance.
FBC-B 1603FBC-B 1604.8 - #06Accessibility scoping (FBC-A)Code
Alteration or new commercial work triggers accessibility requirements in altered areas and along path of travel.
FBC-A 202FBC-A 206FBC-A 202.4
MechanicalRequired
- #01Specialty exhaust (commercial new)Life Safety
Kitchen hoods (FBC-M 507), spray booths (FBC-M 502.7), and chemical storage (FBC-M 502.8) require specialty exhaust.
FBC-M 502.7FBC-M 502.8FBC-M 507 - #02Combustion air and ventingLife Safety
Fuel-fired equipment requires combustion air and proper venting per FBC-M 303 / 804.
FBC-M 303FBC-M 804FBC-FG 304.1FBC-FG 503 - #03Ventilation per FBC-M 403 (occupancy-based)Code
Outdoor air ventilation rates per FBC-M Table 403.3 / ASHRAE 62.1.
FBC-M 403
ElectricalRequired
- #01Emergency and standby systems (new commercial)Life Safety
Emergency lighting, exit sign power, and standby power per NEC 700/701 and FBC-B 1008.
NEC 700NEC 701FBC-B 1008 - #02Grounding and bondingLife Safety
Grounding electrode, equipment grounding, and bonding per NEC Article 250.
NEC 250 - #03Service size and load calculationCode
Electrical service and feeder sizing supported by NEC Article 220 load calculation.
NEC 220NEC 230
PlumbingRequired
- #01Minimum fixture count (FBC-P Table 403.1)Code
Minimum plumbing fixtures per occupancy and occupant load per FBC-P Table 403.1.
FBC-P 403 - #02Water service and DWV sizingCode
Water service line sizing and DWV sizing consistent with fixture unit count.
FBC-P 604FBC-P 709FBC-P 906 - #03Backflow preventionCode
Backflow prevention required at well, irrigation, or other cross-connections per FBC-P 608.
FBC-P 608
Section 3
Inspection Walkthrough
Inspections are listed in their typical phase order. Your own inspection list comes from your approved plans. Inspections marked “If in scope” apply only when your plans include that work. Call (772) 222-6679 with questions.
Plumbing
Plumbing Underground
- Pipe material and sizingCritical
Verify pipe material and sizes match approved plans
FBC-P 604.3FBC-P 605.4 - Burial depthCritical
Show actual trench cover against approved plans and applicable pipe material; no universal plumbing burial depth is asserted.
- Pipe slope and supportCritical
Verify proper slope on drain lines and adequate support
FBC-P 704.1FBC-P 306.1 - Pressure testCritical
Verify plumbing system holds required pressure test
FBC-P 312.2FBC-P 312.5 - Cleanout locations
Verify cleanout access points are installed per plans
FBC-P 708.1
Electrical
Electrical Underground
If in scope- Conduit installationCritical
Verify conduit material, size, and routing per plans
NEC 300.5 - Burial depthCritical
Verify conduit burial depth meets code minimum
NEC 300.5 - UFER ground connectionCritical
Verify UFER grounding electrode is properly connected to rebar in footing
NEC 250.52 - Conduit protection
Verify conduit is protected from damage where exposed
NEC 300.5
Mechanical
Mechanical Underground
If in scope- Under-slab layoutCritical
Match duct, refrigerant, or condensate line locations to approved plans.
- Material and protectionCritical
Show listed materials, sleeves, and protection where lines pass through concrete or soil.
- Slope and drainageCritical
Verify condensate drainage and slopes shown on the plans.
- Connections and supportsCritical
Keep underground joints, supports, and transitions visible before backfill.
- Required testsCritical
Have any specified duct or piping tests ready before concealment.
Building
Footing / Grade Beam
- Footing dimensionsCritical
Verify footing width and depth match approved plans
- Rebar size and spacingCritical
Verify rebar size, spacing, and placement per plans
- UFER grounding electrodeCritical
Where the approved electrical design uses a concrete-encased electrode, show the specified material, length, placement, and connection before concrete.
NEC 250.52 - Foundation anchorage layout
Verify anchor bolt placement for sill plate attachment
Stem Wall
If in scope- Stem wall layoutCritical
Match the wall location and dimensions to the approved foundation plan.
- Wall reinforcementCritical
Check vertical and horizontal reinforcement, laps, and clear cover before fill.
- Anchorage and connectionsCritical
Show anchors and connections between the stem wall, footing, and floor system.
- Open cells and formsCritical
Keep masonry cells or forms open and visible until inspection.
- Backfill holdCritical
Do not backfill or conceal the stem wall before the inspection.
Piling / Pile Cap
If in scope- Pile layoutCritical
Match pile or pier locations and count to the approved structural plan.
- Pile size and depthCritical
Document pile dimensions, embedment, or installation records required by the plans.
- Pile cap reinforcementCritical
Show cap or pier forms, steel, laps, and cover before concrete.
- Connection to structureCritical
Show specified pile-to-cap and cap-to-structure connections.
- Engineering documentationCritical
Have the approved pile design and required installation or test records available.
Slab
If in scope- Slab vapor barrierCritical
Verify vapor barrier is installed under slab per plans
- Slab thickness and wire meshCritical
Verify slab thickness and reinforcement per plans
- Slab forms and elevationCritical
Verify slab outline, thickness, and elevations match the approved plans.
- Under-slab preparationCritical
Show prepared base, penetrations, and required under-slab work before the pour.
- Reinforcing supportCritical
Show slab steel or mesh supported at the planned position and with required laps.
Fill Cell / Column
If in scope- Pre-grout cell inspectionCritical
Show open reinforced cells and planned grout placement before concealment.
- Vertical rebar placementCritical
Verify vertical rebar is properly placed and spaced in block wall
- Open vertical cellsCritical
Keep reinforced masonry cells visible before grout is placed.
- Column reinforcementCritical
Verify column or pilaster steel, ties, laps, and cover against the plans.
- Cell cleanlinessCritical
Confirm reinforced cells are clear of mortar droppings and debris.
Lintel / Tie Beam
If in scope- Tie beam reinforcementCritical
Verify tie beam rebar size, spacing, and lap splices per plans
- Lintel reinforcementCritical
Verify lintel rebar and sizing over openings per plans
Window / Door Framing
- Anchor and fastener patternCritical
Verify anchoring method and fastener spacing per manufacturer installation instructions
- Rough opening dimensionsCritical
Measure each opening against the approved plans and selected unit.
- Buck attachmentCritical
Show buck material, anchors, spacing, and substrate before the unit covers them.
- Product approval matchCritical
Have the approved opening product and installation details available.
- Opening conditionCritical
Show a sound, prepared opening and required clearance for the unit.
Framing
- Wall stud spacing and sizeCritical
Verify stud size and spacing match approved plans
- Headers and beamsCritical
Verify header and beam sizes over openings per plans
- Top and bottom plate connectionsCritical
Verify double top plates with proper lapping and anchored bottom plates
- Corner and intersection bracingCritical
Verify proper bracing at corners and wall intersections
- Window and door rough openingsCritical
Verify rough openings match approved plans for size and location
- Hurricane straps and hold-downsCritical
Verify hurricane straps and hold-down hardware installed per plans
- Fire blocking
Verify fire blocking is installed at required locations
- Fire separation wall framingCritical
Verify party/fire wall is framed continuously from foundation to underside of roof sheathing per plans
- Draft stopping in party wallCritical
Verify draft stopping is installed in concealed spaces of the fire separation wall
- Truss spacing and alignmentCritical
Verify truss spacing and alignment match approved plans
- Truss-to-wall connectionCritical
Verify hurricane clips or straps at every truss-to-wall connection
- Truss bracingCritical
Verify lateral and diagonal bracing is installed per truss engineering
- Truss engineering on siteCritical
Verify the truss engineering package is available and matches installed trusses
- Gable end bracing
Verify gable end trusses are properly braced
Roof Sheathing
If in scope- Roof sheathing attachmentCritical
Verify roof deck nailing pattern and edge spacing per the approved nailing schedule.
- Roof sheathing material and thicknessCritical
Verify roof sheathing panel material, thickness, and span rating match the approved plans.
- Panel gap spacing at roof deck
Verify proper edge gap between roof sheathing panels per the panel manufacturer.
Wall Sheathing
If in scope- Wall sheathing attachmentCritical
Verify wall sheathing nailing pattern and edge spacing per the approved nailing schedule (shear wall zones often require tighter spacing).
- Wall sheathing material and thicknessCritical
Verify wall sheathing panel material, thickness, and grade stamp match the approved plans.
- Panel gap spacing at walls
Verify proper edge gap between wall sheathing panels per the panel manufacturer.
Roof Dry-In
- Underlayment installationCritical
Verify roof underlayment is installed per code and manufacturer specs
Plumbing
Plumbing Rough-In
- Supply pipe sizing and materialCritical
Verify supply pipe sizes and material match approved plans
FBC-P 604.3FBC-P 605.4 - DWV pipe sizing and slopeCritical
Verify drain, waste, and vent pipe sizes and slope per plans
FBC-P 704.1 - Pipe support and hangingCritical
Verify pipes are properly supported at required intervals
FBC-P 308.1 - Vent termination locations
Verify vent route and planned termination through the roof or side wall as approved.
FBC-P 903.1 - Water heater rough-in
Where a water heater is in scope, compare rough location and connections with approved plans and manufacturer instructions; show a pan if leakage could cause damage.
FBC-P 502.1FBC-P 504.7
Electrical
Electrical Rough-In
- Panel installationCritical
Verify electrical panel is properly mounted and sized per plans
- Wire sizing per circuitsCritical
Verify wire gauge matches breaker amperage for each circuit
NEC 240.4 - Box fill and installationCritical
Verify electrical boxes are properly installed and not overfilled
NEC 314.16 - GFCI and AFCI locationsCritical
Verify GFCI and AFCI protection is provided where required
NEC 210.8NEC 210.12 - Alarm installation methods where applicableCritical
Where the approved occupancy and scope require alarms, show the specified smoke-alarm power/interconnection method and any CO alarm installation; do not assume both are hardwired.
FBC-B 907.2.11 - Grounding and bondingCritical
Verify grounding electrode system and bonding connections
NEC 250.50
Mechanical
Mechanical Rough-In
- Ductwork installationCritical
Verify duct sizes, routing, and support match approved plans
FBC-M 603.1 - Duct sealingCritical
Verify duct joints and connections are properly sealed
FBC-M 603.9 - Equipment placementCritical
Verify air handler and condenser locations per plans with required clearances
FBC-M 304.1 - Refrigerant line installation
Match refrigerant line size, insulation, and route to approved plans; leave field-installed joints visible before cover.
FBC-M 1107.7 - Return air pathway
Show return-air path and grille or transfer opening against approved mechanical plans.
FBC-M 601.6
Building
Fire / Smoke Penetrations
If in scope- Rated assembly identificationCritical
Identify each rated wall, floor, smoke barrier, or partition shown on the plans.
- Listed system matchCritical
Match each sealant, collar, or device to the approved listed firestop system.
- Penetration preparationCritical
Show annular space, backing material, and substrate before concealment.
- Complete sealCritical
Check the seal around the full penetration and at rated joints.
- Inspection accessCritical
Keep all firestop locations visible until inspection.
Insulation
- Wall cavity insulation R-valueCritical
Verify wall insulation R-value matches energy calculations
FBC-E C402.2 - Ceiling/attic insulation R-valueCritical
Verify ceiling or attic insulation R-value per energy calculations
FBC-E C402.2 - Insulation coverage and gapsCritical
Verify no gaps, voids, or compression in insulation installation
FBC-E C402.2 - Air sealing
Verify air sealing at penetrations, top plates, and rim joists
FBC-E C402.5
Roof In-Progress
If in scope- Drip edge installationCritical
Verify drip edge is installed at eaves and rakes
- Valley and flashingCritical
Verify valley flashing and wall flashing are properly installed
- Roof penetration sealing
Verify all roof penetrations are properly sealed and flashed
- Covering materialCritical
Match roof tile, shingles, or metal panels to the approved plans and product approval.
- Covering attachmentCritical
Show fastener or clip pattern before it is concealed by the next course.
- Flashing installationCritical
Show flashing at valleys, walls, edges, and penetrations while accessible.
Exterior Wall Covering (Lath / Stucco / Siding)
If in scope- Wall covering material and installationCritical
Verify exterior wall covering material matches approved plans and is properly installed
- Weather-resistive barrierCritical
Verify weather-resistive barrier is properly installed behind cladding
- Flashing at penetrations and transitionsCritical
Verify flashing is installed at windows, doors, and wall transitions
- Fastener pattern and spacing
Verify cladding fastener type and spacing per manufacturer and plans
Soffit
If in scope- Soffit material and attachmentCritical
Verify soffit material matches approved plans and is properly attached
- Ventilation openingsCritical
Verify soffit ventilation openings are properly sized and screened
- Continuous coverage
Verify soffit is installed continuously with no gaps
- Fascia attachmentCritical
Show fascia material and fastening where fascia is included in the permit.
- Openings and edgesCritical
Check soffit attachment at edges, corners, and openings.
Drywall / Gypsum Board
If in scopeBD-DependentMost jurisdictions skip this inspection for this project type. Confirm with your building department whether they'll require it.
- Drywall thickness and typeCritical
Match board type, thickness, exposure rating, and layers to the approved rated or shear assembly.
- Fastener spacingCritical
Verify screw or nail spacing meets code requirements
- Fire-rated assembliesCritical
Verify fire-rated walls and ceilings have proper drywall layers per rating
- Fire-rated party wall assemblyCritical
Verify party wall has required layers of Type X gypsum per fire rating (typically 1-hour)
Electrical
Temporary Power
If in scope- Temporary power pole and meterCritical
Verify temporary power pole is properly set with meter base and disconnect
NEC 590.4 - Grounding electrodeCritical
Verify grounding rod is installed and connected to temporary panel
NEC 250.52 - GFCI protectionCritical
Verify all temporary receptacles have GFCI protection
NEC 590.6 - Service equipmentCritical
Show temporary service equipment, overcurrent protection, and approved location.
- Safe installationCritical
Confirm temporary wiring is supported and protected from damage.
Power Release / Service
If in scope- Service equipment installedCritical
Show meter enclosure, disconnect, and service conductors ready for utility connection.
- Service grounding and bondingCritical
Show grounding electrode and bonding connections at the service.
- Panel and circuit identificationCritical
Label service and affected panels clearly.
- Utility release readinessCritical
Have the approved service plans and required utility coordination available.
- Safe energizationCritical
Confirm exposed wiring is protected and all covers are installed before release.
Electrical Final
- Panel complete and labeledCritical
Verify panel cover installed, all breakers labeled, no open knockouts
NEC 408.4NEC 408.7 - GFCI and AFCI operationalCritical
Verify all GFCI and AFCI devices test and reset properly
NEC 210.8NEC 210.12 - Receptacle and switch functionCritical
Verify outlets and switches operate correctly throughout
- Light fixtures installed
Verify all light fixtures are installed and operational
NEC 210.70 - Exterior lighting and outletsCritical
Where in scope, demonstrate outdoor GFCI protection and required exterior entrance lighting.
NEC 210.8NEC 210.70
Plumbing
Plumbing Final
- Fixture installation and operationCritical
For fixtures in the approved scope, show level alignment, water and drainage connections, and live operation.
FBC-P 405.3FBC-P 301.3FBC-P 301.4 - Water heater installationCritical
Where a water heater is in scope, show the installed relief valve and discharge piping. For a storage-type heater, show a pan only where tank leakage would cause damage. Show the pan drain where required; a replacement needs no new pan drain if none was previously installed (FBC-P 504.7.2).
FBC-P 504.4FBC-P 504.6FBC-P 504.7FBC-P 504.7.1FBC-P 504.7.2 - No visible leaksCritical
During the live fixture run, show exposed connections and surrounding areas with no visible leaks.
- Hose bibbs and exterior plumbing
Where exterior hose connections are in scope, show backflow protection and operation.
FBC-P 608.16.4.2
Mechanical
Mechanical Final
- System operational testCritical
Demonstrate the installed system operating in its approved heating, cooling, exhaust, or hood mode as applicable.
- Air handler and condenser installationCritical
If an air handler or condenser is in scope, show installed equipment, clearance, support, and manufacturer labels.
FBC-M 304.1 - Condensate drainCritical
Where cooling equipment produces condensate, show the drain and approved termination.
FBC-M 307.2 - Duct registers and grilles
Show supply and return openings and demonstrate airflow at representative locations.
FBC-M 603.18 - Equipment labels and data plates
Match installed equipment model and rating to approved plans and manufacturer instructions.
FBC-M 304.1
Building
Roof Final
- Roofing material installationCritical
Verify roofing material is installed per manufacturer specs and approved plans
- Flashing completenessCritical
Verify all flashing is complete at walls, valleys, penetrations, and edges
- Ridge vent or ventilation
Show roof or attic ventilation where the approved design requires it.
- Covering attachment evidenceCritical
Show in-progress evidence for concealed fasteners, clips or adhesive and visible attachment at roof edges and terminations.
- Cleanup and debris removal
Verify job site is clean with no exposed nails or debris in gutters
- Completed roofCritical
Confirm all roof planes, edges, penetrations, and terminations are complete.
Building Final
Typical Final- Egress doors and hardwareCritical
Verify egress doors provide minimum 32-inch clear width and proper hardware
- Smoke alarms installed and operationalCritical
Where the approved occupancy includes dwelling or sleeping units, show required smoke alarms and demonstrate operation.
- CO alarms installedCritical
Where the approved occupancy and equipment trigger carbon monoxide alarms, show installed and operating devices.
- Emergency escape openingsCritical
Where approved sleeping rooms require emergency escape openings, show representative opening dimensions and operation.
- Stairway complianceCritical
If stairs are in scope, demonstrate approved rise, run, handrails, and accessible route.
- Party wall continuity and sealingCritical
Verify fire separation wall is complete with no unsealed penetrations, gaps, or breaches from foundation to roof
- Address numbers visible
Verify address numbers are posted and visible from street
- Exterior finishes complete
Verify exterior cladding, trim, and weatherproofing are complete
- Site grading and drainage
Show finished grading and drainage against approved site plans; no universal residential 6-in-10-ft rule.