Remodels & alterations

Remodel plans reviewed in hours, not weeks

Single-family alteration and remodel plans come back in hours, and your crew requests each inspection in the myFCC app when the work is ready, with no scheduling. For licensed contractors who run remodels and alterations every month. You still file the permit and NTBO.

Freedom Code ComplianceSample

Plan Review Report

Seagrape Lane Remodel · Single Family Alteration

Project

Address
771 SW Seagrape Ln, Port St. Lucie, FL
Building department
City of Port St. Lucie
Permit
BR-26-006087

Design criteria

Building code
Plans: FBC 8th Edition (2023), NEC 2020
Checked: Edition in effect
Flood zone
Plans: Zone X
Checked: FEMA Zone X, minimal flood hazard

Documents and seals

Address and scope on every sheet match the project.

What we verified

  • Structural impact of load-bearing changesFBC-EB 503.3, FBC-R R301
  • Egress, smoke and CO alarms in the work areaFBC-EB 703.2, FBC-R R310, FBC-R R314, FBC-R R315
  • Window and door product approvalsF.S. 553.842, FBC-R R609.3
  • AFCI and GFCI protection in the work areaNEC 210.8, NEC 210.12
  • HVAC equipment scheduleFBC-E R403
  • Fixture layout for added or moved fixturesFBC-P 701, FBC-P 901

Courtesy comments

None on this plan set.

PRR-BR-26-006087 · Oct 1, 2026
Sample report for a fictional project. Result: Pass.

Pricing

Priced per project

FCC quotes this work per project. Building department permit fees are separate: FCC does not set, quote, or collect them. The first revision is included. Later revisions are billed from $50 up to half of the original fee.

Volume pricing is available for contractors at scale.

Talk to sales
  • Single-family alteration

    Priced per project.

  • Single-family repair or remodel

    Priced per project.

  • Multifamily alteration

    Priced per project.

  • Multifamily repair or remodel

    Priced per project.

Sound familiar?

  • A remodel stuck in the plan review queue before demo can start
  • Inspection windows holding up drywall and the next trade
  • Correction rounds that send the plans back to the end of the line
  • Homeowners asking why nobody is working

Remodels & alterations

What changes the day you switch

  • Every permit in one place

    Submit plans, request inspections and track every project in myFCC, on your phone or desktop.

  • No scheduling

    Request when the work is ready and a licensed inspector joins in minutes.

  • One office, every brand

    An organization login sees and manages every company and branch under it, so one office can run permitting for several brands.

Every project in one place

Submit plans, request inspections and track every project in myFCC, on your phone or desktop.

Check Out myFCC

Remodels & alterations

Common projects

The alteration and remodel work licensed contractors run every month.

  • Kitchen and Bath Remodels
  • Whole-Home Alterations
  • Load-Bearing Wall Removals
  • Interior Reconfigurations
  • Multifamily Unit Renovations

Single-family plan review

Hours

Single-family plan reviews take hours. Live and offline inspection results come back in minutes.

Apply now

Measured on our platform7-day average · Nov 13 – Nov 19*

Request to live inspector
1 min 56 sec
Offline request to result
10 min
Plan review in workable business hours, start to approved plans
53 min

No scheduling required. You simply request the inspection when the work is ready. Live inspection requests are taken Monday to Friday, 9 am to 4:30 pm ET; offline inspections can be submitted any time.

FAQ

Remodels & alterations: FAQs

What remodel and alteration work does FCC take?

Single-family and multifamily alteration and repair or remodel permits: kitchens, baths, interior reconfigurations and load-bearing changes. FCC reviews the building, electrical, mechanical and plumbing scope and performs the inspections under F.S. 553.791. You still file the permit and NTBO.

What does plan review check on a remodel?

Load-bearing changes and the beam or header that carries them, egress and smoke and CO alarms where the work touches bedrooms, product approvals for replacement windows and doors, AFCI and GFCI protection in the work area, the HVAC equipment schedule, and the layout of added or moved plumbing fixtures.

How fast are remodel plan reviews?

Single-family plan reviews come back in hours. Live inspections return results before the call ends, and offline results come back in minutes.

How are plan revisions billed?

The first revision is included. Later revisions are billed from $50 up to half of the original fee.

Who does FCC work with on remodels?

Licensed contractors who run remodel and alteration permits month after month. FCC is set up for steady volume, so we are not the right fit for a one-time project.

Do you offer volume pricing?

Yes. Volume pricing is available for contractors at scale. Talk to sales and tell us how many permits you run a month.

Resources

Built for builders who do not wait.