Additions

Addition plans approved in hours

Room additions, garage conversions and ADUs: single-family plan reviews come back in hours, and every FCC inspection from footing to final is requested in the myFCC app when the work is ready. For licensed contractors who build additions steadily. You still file the permit and NTBO.

Freedom Code ComplianceSample

Plan Review Report

Mangrove Point Addition · Single Family Attached Dwelling Space

Project

Address
2314 SE Mangrove Point Ct, Stuart, FL
Building department
City of Stuart
Permit
BR-26-006142

Design criteria

Building code
Plans: FBC 8th Edition (2023), NEC 2020
Checked: Edition in effect
Wind speed (Vult)
Plans: 165 mph
Checked: 162 mph at this site, Risk Category II
Risk category
Plans: II
Checked: Residential occupancy
Flood zone
Plans: Zone X
Checked: FEMA Zone X, minimal flood hazard

Documents and seals

Sealed by the engineer of record; digital signature intact.

What we verified

  • Structural wall section and load pathFBC-R R301, FBC-R R602
  • Egress from sleeping roomsFBC-R R310
  • Smoke and CO alarm coverageFBC-R R314, FBC-R R315
  • Service size and load calculationNEC 220
  • Manual J, S and D load calculationsFBC-R M1401.3
  • Backflow preventionFBC-P 608

Courtesy comments

None on this plan set.

PRR-BR-26-006142 · Oct 1, 2026
Sample report for a fictional project. Result: Pass.

Pricing

Priced per project

FCC quotes this work per project. Building department permit fees are separate: FCC does not set, quote, or collect them. The first revision is included. Later revisions are billed from $50 up to half of the original fee.

Volume pricing is available for contractors at scale.

Talk to sales
  • Room addition

    Priced per project.

  • Garage conversion to living space

    Priced per project.

  • Attached garage

    Priced per project.

  • Sunroom

    Priced per project.

  • Detached accessory dwelling unit

    Priced per project.

  • Multifamily addition

    Priced per project.

Sound familiar?

  • An addition held in plan review before the footing can be dug
  • Footing, slab and framing inspections each waiting on a county window
  • Tie-in details flagged at framing instead of in review
  • Crews sitting while the next inspection waits

Additions

What changes the day you switch

  • Every permit in one place

    Submit plans, request inspections and track every project in myFCC, on your phone or desktop.

  • No scheduling

    Request when the work is ready and a licensed inspector joins in minutes.

  • One office, every brand

    An organization login sees and manages every company and branch under it, so one office can run permitting for several brands.

Every project in one place

Submit plans, request inspections and track every project in myFCC, on your phone or desktop.

Check Out myFCC

Additions

Common projects

The addition work licensed contractors build month after month.

  • Room Additions
  • Garage Conversions to Living Space
  • Attached Garages
  • Sunrooms
  • Detached ADUs
  • Multifamily Additions

Single-family plan review

Hours

Single-family plan reviews take hours. Live and offline inspection results come back in minutes.

Apply now

Measured on our platform7-day average · Nov 13 – Nov 19*

Request to live inspector
1 min 56 sec
Offline request to result
10 min
Plan review in workable business hours, start to approved plans
53 min

No scheduling required. You simply request the inspection when the work is ready. Live inspection requests are taken Monday to Friday, 9 am to 4:30 pm ET; offline inspections can be submitted any time.

FAQ

Additions: FAQs

What addition work does FCC take?

Room additions, garage conversions to living space, attached garages, sunrooms, detached accessory dwelling units and multifamily additions. FCC reviews the building, electrical, mechanical and plumbing scope and performs the inspections under F.S. 553.791. You still file the permit and NTBO.

What does plan review check on an addition?

Design wind speed and exposure, the wall section and load path from foundation to roof, egress from new bedrooms, smoke and CO alarms, Florida product approvals, service size and load, AFCI and GFCI protection, grounding, the Manual J, S and D calculations, ventilation and combustion air, and water and drain sizing.

Does FCC review ADUs?

Yes. FCC reviews detached accessory dwelling units, and garage conversions to living space, under the Florida Building Code. Local zoning and setback rules stay with the jurisdiction; FCC reviews the building, mechanical, electrical and plumbing scope.

How are plan revisions billed?

The first revision is included. Later revisions are billed from $50 up to half of the original fee.

Who does FCC work with on additions?

Licensed contractors who run addition permits month after month. FCC is set up for steady volume, so we are not the right fit for a one-time project.

Do you offer volume pricing?

Yes. Volume pricing is available for contractors at scale. Talk to sales and tell us how many permits you run a month.

Resources

Built for builders who do not wait.