Commercial alterations & build-outs
Your next build-out approved in days, not weeks
Most commercial plan reviews take 1–2 days, so every store, office or restaurant build-out moves on your schedule. Built for contractors who run alterations and build-outs for the same brand or client at site after site. Not threshold buildings or hotels. You still file the permit and NTBO.
- Commercial reviews
- 1–2 Days
- Offline inspections
- Minutes
- Florida counties
- 55
- HB 803 minimum reductions
- 25% / 50%
Plan Review Report
Bayside Plaza Retail Build-Out · Commercial Alteration
Project
- Address
- 2150 SE Bayside Plaza Blvd, Suite 104, Stuart, FL
- Building department
- City of Stuart
- Permit
- COM-26-00744
Design criteria
On the plans
Checked against
- Building code
- Plans: FBC 8th Edition (2023), NEC 2020
- Checked: Edition in effect
- Flood zone
- Plans: Zone X
- Checked: FEMA Zone X, minimal flood hazard
Documents and seals
Sealed by the engineer of record; digital signature intact.
What we verified
- Occupancy classificationFBC-B 302, FBC-EB 1001
- Fire-resistance rated separationsFBC-B 602, FBC-B 711, FBC-B 716
- Means of egress in the altered areaFBC-B 1004, FBC-B 1005, FBC-B 1006, FBC-B 1017
- Accessibility along the path of travelFBC-A 202.4, FBC-A 206
- Service and feeder capacityNEC 220, NEC 230
- Outdoor air ventilationFBC-M 403
Courtesy comments
None on this plan set.
Pricing
Priced per project
FCC quotes this work per project. Building department permit fees are separate: FCC does not set, quote, or collect them. The first revision is included. Later revisions are billed from $50 up to half of the original fee.
Volume pricing is available for contractors at scale.
Talk to salesCommercial alteration
Priced per project.
Commercial remodel
Priced per project.
Commercial addition
Priced per project.
Sound familiar?
- The same brand standard waiting in a new queue at every location
- A tenant's opening date riding on plan review
- Inspection coordination across trades at several stores at once
- Rent and carrying costs adding up while each space waits
Commercial alterations & build-outs
What changes the day you switch
Commercial Review Speed
Most commercial plan reviews take 1–2 days, with revision cycles prioritized to protect opening dates.
One office, every brand
An organization login sees and manages every company and branch under it, so one office can run permitting for several brands.
Commercial Fee Reductions
For commercial projects, F.S. 553.791(2)(d) requires at least a 25% reduction of the plan-review or inspection portion of the permit fee, and at least 50% when the private provider performs all required services.
Every project in one place
Submit plans, request inspections and track every project in myFCC, on your phone or desktop.
Check Out myFCCCommercial alterations & build-outs
Common projects
Same brand standard, same inspection list, store after store.
Commercial Alterations
retail, restaurant and office build-outs in existing space, built to the same brand standard at many sites (FBC-Existing Building)
Repeat build-out examples
- Retail Store Build-Outs
- Restaurant Build-Outs
- Office Interiors
- Commercial Remodels
- Commercial Additions
Commercial Plan Review Turnaround
1–2 Days
Most commercial plan reviews take 1–2 days. Live virtual inspections return results during the call, and eligible offline inspections typically return within minutes.
Apply nowMeasured on our platform7-day average · Nov 13 – Nov 19*
- Request to live inspector
- Offline request to result
- Plan review in workable business hours, start to approved plans
No scheduling required. You simply request the inspection when the work is ready. Live inspection requests are taken Monday to Friday, 9 am to 4:30 pm ET; offline inspections can be submitted any time.
FAQ
Commercial alterations & build-outs: FAQs
What commercial alteration work does FCC take?
Repeatable work: alterations, remodels and build-outs for the same brand or client across many sites, such as a contractor building out stores for one retail brand. FCC does not take threshold buildings or hotels.
What does FCC check on a commercial alteration?
Occupancy classification and any change of use, fire-resistance rated separations, sprinkler, alarm and emergency lighting coverage, means of egress in the altered area, accessibility along the path of travel, structural changes, service and feeder capacity, ventilation and specialty exhaust, and fixture counts and grease waste where there is food service.
How fast are commercial plan reviews with FCC?
Most commercial plan reviews take 1–2 days, with revision reviews prioritized to keep the job moving.
How are plan revisions billed?
The first revision is included. Later revisions are billed from $50 up to half of the original fee.
Can FCC work alongside my permit expediter?
Yes. Many commercial teams already have a permit expediter or architect managing submissions. FCC fits into that process with private-provider plan reviews and inspections, so the build-out is not waiting on the public review queue.
How do the 2026 private-provider fee updates affect commercial alterations?
For commercial projects, F.S. 553.791(2)(d) (HB 803, effective July 1, 2026) requires at least a 25% reduction of the plan-review or inspection portion of the permit fee, and at least a 50% reduction when the private provider performs all required plan review and inspection services.
Do you offer volume pricing?
Yes. Volume pricing is available for contractors at scale. Talk to sales and tell us how many permits you run a month.
Resources


