- #01Plan and document coordination
Obvious clerical, title-block, sheet-index, permit-description, or cross-sheet inconsistencies visible in the submitted documents. A Courtesy Comment on these items does not cause FCC to fail or return the plan set unless the same condition also creates a building-code compliance issue within FCC's review scope.
FBC-B 107.2.1 - #02Zoning and site coordination
Apparent setback, lot-coverage, use, or site-dimension conflicts visible in the submitted plans that could cause the plans to fail Planning and Zoning review. Planning and Zoning makes the zoning and lot-compliance determination. The absence of a Courtesy Comment is not approval of those separate requirements.
- #03Floodplain coordination
Apparent inconsistencies or missing coordination in flood-zone, design-flood-elevation, finished-floor, or flood-opening information shown on the plans that could cause the plans to fail floodplain review. The floodplain administrator makes the determination. The absence of a Courtesy Comment is not approval of those separate requirements.
- #04Fire-authority coordination
Apparent separately reviewed fire alarm, sprinkler, hood-suppression, smoke-control, or similar coordination issues visible on the plans that could cause the plans to fail fire review. The fire marshal makes the determination. The absence of a Courtesy Comment is not approval of those separate requirements.
Commercial Plumbing Only
Plumbing-only alteration in an existing commercial, apartment, or condo building. Use Re-Pipe for replacement lines.
Last updated: Sep 29, 2026
Section 1
Required Documents
Submit these with your initial project package.
Always required
- Plumbing PlansPlumbing plans for the work. A licensed plumbing contractor may prepare unsealed plans for a system it installs within the limits of F.S. 471.003(2)(h). Plans prepared by an engineer carry the engineer's seal.
Courtesy screen
Courtesy screen on every plan review
Every plan FCC reviews receives a limited courtesy screen for the items below when they are reasonably visible in the submitted documents. If we see an apparent issue that could cause the plans to fail review by another agency, we will identify it as a Courtesy Comment. Courtesy Comments alone do not cause FCC to fail or return the plan set unless the same condition also creates a building-code compliance issue within FCC's review scope. The responsible agency makes the final determination—for example, Planning and Zoning for setbacks, lot coverage, use, and other lot-compliance matters. The absence of a Courtesy Comment is not approval of those separate requirements.
Section 2
Approval criteria for this project type
These are the building-code criteria FCC uses to determine the plan-review result. An unresolved item may be issued as a Required Correction and cause the plan set to be returned for correction.
PlumbingConditional review scope
- #01Re-pipe materials and scopeCode
Re-pipe scope must show approved materials, routing, and fixture count consistent with DWV sizing.
FBC-P 605FBC-P 709 - #02Backflow preventionCode
Backflow prevention required at well, irrigation, or other cross-connections per FBC-P 608.
FBC-P 608 - #03Plan review applicability (FBC 107.3.5)Documentation
Per FBC-B 107.3.5, plan review is not required for minor plumbing repairs (Exemption #3). FCC performs this review only when the building department requires plan review or the client opts in.
FBC-B 107.3.5
Items marked Conditional review scope are non-blocking. Per FBC 107.3.5, plan review isn't required for these scopes — FCC reviews them when the building department requests it or the client wants the extra set of eyes.
Section 3
Inspection Walkthrough
Inspections are listed in their typical phase order. Your own inspection list comes from your approved plans. Inspections marked “If in scope” apply only when your plans include that work. Call (772) 222-6679 with questions.
Plumbing
Plumbing Rough-In
- Supply pipe sizing and materialCritical
Verify supply pipe sizes and material match approved plans
FBC-P 604.3FBC-P 605.4 - DWV pipe sizing and slopeCritical
Verify drain, waste, and vent pipe sizes and slope per plans
FBC-P 704.1 - Pipe support and hangingCritical
Verify pipes are properly supported at required intervals
FBC-P 308.1 - Vent termination locations
Verify vent route and planned termination through the roof or side wall as approved.
FBC-P 903.1 - Water heater rough-in
Where a water heater is in scope, compare rough location and connections with approved plans and manufacturer instructions; show a pan if leakage could cause damage.
FBC-P 502.1FBC-P 504.7
Plumbing Final
Typical Final- Fixture installation and operationCritical
For fixtures in the approved scope, show level alignment, water and drainage connections, and live operation.
FBC-P 405.3FBC-P 301.3FBC-P 301.4 - Water heater installationCritical
Where a water heater is in scope, show the installed relief valve and discharge piping. For a storage-type heater, show a pan only where tank leakage would cause damage. Show the pan drain where required; a replacement needs no new pan drain if none was previously installed (FBC-P 504.7.2).
FBC-P 504.4FBC-P 504.6FBC-P 504.7FBC-P 504.7.1FBC-P 504.7.2 - No visible leaksCritical
During the live fixture run, show exposed connections and surrounding areas with no visible leaks.
- Hose bibbs and exterior plumbing
Where exterior hose connections are in scope, show backflow protection and operation.
FBC-P 608.16.4.2