Multi Family

Multi Family Repair/Remodel

Finish-only repair or restoration of an existing apartment or condo space without structural changes. Add affected trade inspections only when work changes systems.

Last updated: Sep 29, 2026

Section 1

Required Documents

Submit these with your initial project package.

Always required

  • Plans or Detailed Drawings
    Plans or detailed drawings reflecting the full scope of remodel work

Conditional

  • Scope of Work Description
    Very detailed written scope of work describing all work to be performed
    WhenThe scope of work you type on the submission form counts. A separate document is not needed.
  • Product Approvals
    Florida Product Approvals for any regulated components being installed
    WhenRequired if installing new windows, doors, roofing, or other regulated products
  • Construction Plans
    Plans showing the structural changes. Plans prepared by a Florida-registered architect or engineer carry that professional's seal. Plans prepared by a contractor or owner are accepted without a seal unless Florida law or the building department requires professional plans.
    WhenRequired if scope includes structural changes

Courtesy screen

Courtesy screen on every plan review

Every plan FCC reviews receives a limited courtesy screen for the items below when they are reasonably visible in the submitted documents. If we see an apparent issue that could cause the plans to fail review by another agency, we will identify it as a Courtesy Comment. Courtesy Comments alone do not cause FCC to fail or return the plan set unless the same condition also creates a building-code compliance issue within FCC's review scope. The responsible agency makes the final determination—for example, Planning and Zoning for setbacks, lot coverage, use, and other lot-compliance matters. The absence of a Courtesy Comment is not approval of those separate requirements.

  1. #01Plan and document coordination

    Obvious clerical, title-block, sheet-index, permit-description, or cross-sheet inconsistencies visible in the submitted documents. A Courtesy Comment on these items does not cause FCC to fail or return the plan set unless the same condition also creates a building-code compliance issue within FCC's review scope.

    FBC-B 107.2.1
  2. #02Zoning and site coordination

    Apparent setback, lot-coverage, use, or site-dimension conflicts visible in the submitted plans that could cause the plans to fail Planning and Zoning review. Planning and Zoning makes the zoning and lot-compliance determination. The absence of a Courtesy Comment is not approval of those separate requirements.

  3. #03Floodplain coordination

    Apparent inconsistencies or missing coordination in flood-zone, design-flood-elevation, finished-floor, or flood-opening information shown on the plans that could cause the plans to fail floodplain review. The floodplain administrator makes the determination. The absence of a Courtesy Comment is not approval of those separate requirements.

  4. #04Fire-authority coordination

    Apparent separately reviewed fire alarm, sprinkler, hood-suppression, smoke-control, or similar coordination issues visible on the plans that could cause the plans to fail fire review. The fire marshal makes the determination. The absence of a Courtesy Comment is not approval of those separate requirements.

Section 2

Approval criteria for this project type

These are the building-code criteria FCC uses to determine the plan-review result. An unresolved item may be issued as a Required Correction and cause the plan set to be returned for correction.

BuildingRequired

  1. #01Fire-rated unit separation (altered areas)Life Safety

    Dwelling-unit and corridor separations must maintain their original fire-resistance rating through any remodel work.

    FBC-B 420FBC-B 711FBC-B 708
  2. #02Means of egress in altered areasLife Safety

    Alterations must not reduce the capacity, width, or arrangement of the means of egress below code.

    FBC-B 1004FBC-B 1005FBC-B 1020
  3. #03Structural alterations and load pathLife Safety

    Any wall removal, beam substitution, or opening change requires engineered structural details.

    FBC-B 1603FBC-EB 503
  4. #04Product approvals if fenestration is alteredCode

    New or replaced windows/doors in altered areas require Florida product approval matching the wind zone.

    F.S. 553.842F.S. 553.8425Rule 61G20-3 F.A.C.FBC-B 1609FBC-B 1709.5
  5. #05Sound transmission (party walls and floor/ceiling)Performance

    Altered party walls or floor/ceiling assemblies between dwelling units must meet STC and IIC minimums.

    FBC-B 1207

MechanicalRequired

  1. #01Unit HVAC alteration and ventingLife Safety

    HVAC changes in a unit must maintain proper combustion air, venting, and clearances - and must not breach fire-rated assemblies without approved firestop.

    FBC-M 303FBC-M 804FBC-B 714.1

ElectricalRequired

  1. #01AFCI/GFCI protection for altered circuitsLife Safety

    Circuits added or extended must include AFCI/GFCI protection per current NEC, even if existing circuits predate the requirement.

    NEC 210.8NEC 210.12
  2. #02Service/feeder adequacy for added loadCode

    If remodel adds load (new equipment, added circuits), verify existing service and feeders can carry the new total load.

    NEC 220NEC 230NEC 408

PlumbingRequired

  1. #01Re-piping or fixture additionsCode

    Re-piping or new fixtures must maintain DWV sizing, vent arrangement, and rated-assembly integrity at penetrations.

    FBC-P 605FBC-P 709FBC-P 906FBC-B 714

Section 3

Inspection Walkthrough

Inspections are listed in their typical phase order. Your own inspection list comes from your approved plans. Inspections marked “If in scope” apply only when your plans include that work. Call (772) 222-6679 with questions.

Building

Phase #1

Framing

If in scope
  1. Wall stud spacing and sizeCritical

    Verify stud size and spacing match approved plans

  2. Headers and beamsCritical

    Verify header and beam sizes over openings per plans

  3. Top and bottom plate connectionsCritical

    Verify double top plates with proper lapping and anchored bottom plates

  4. Corner and intersection bracingCritical

    Verify proper bracing at corners and wall intersections

  5. Window and door rough openingsCritical

    Verify rough openings match approved plans for size and location

  6. Hurricane straps and hold-downsCritical

    Verify hurricane straps and hold-down hardware installed per plans

  7. Fire blocking

    Verify fire blocking is installed at required locations

Phase #2

Roof Dry-In

If in scope
  1. Underlayment installationCritical

    Verify roof underlayment is installed per code and manufacturer specs

Plumbing

Phase #3

Plumbing Rough-In

If in scope
  1. Supply pipe sizing and materialCritical

    Verify supply pipe sizes and material match approved plans

    FBC-P 604.3FBC-P 605.4
  2. DWV pipe sizing and slopeCritical

    Verify drain, waste, and vent pipe sizes and slope per plans

    FBC-P 704.1
  3. Pipe support and hangingCritical

    Verify pipes are properly supported at required intervals

    FBC-P 308.1
  4. Vent termination locations

    Verify vent route and planned termination through the roof or side wall as approved.

    FBC-P 903.1
  5. Water heater rough-in

    Where a water heater is in scope, compare rough location and connections with approved plans and manufacturer instructions; show a pan if leakage could cause damage.

    FBC-P 502.1FBC-P 504.7

Electrical

Phase #4

Electrical Rough-In

If in scope
  1. Panel installationCritical

    Verify electrical panel is properly mounted and sized per plans

  2. Wire sizing per circuitsCritical

    Verify wire gauge matches breaker amperage for each circuit

    NEC 240.4
  3. Box fill and installationCritical

    Verify electrical boxes are properly installed and not overfilled

    NEC 314.16
  4. GFCI and AFCI locationsCritical

    Verify GFCI and AFCI protection is provided where required

    NEC 210.8NEC 210.12
  5. Alarm installation methods where applicableCritical

    Where the approved occupancy and scope require alarms, show the specified smoke-alarm power/interconnection method and any CO alarm installation; do not assume both are hardwired.

    FBC-B 907.2.11
  6. Grounding and bondingCritical

    Verify grounding electrode system and bonding connections

    NEC 250.50

Mechanical

Phase #5

Mechanical Rough-In

If in scope
  1. Ductwork installationCritical

    Verify duct sizes, routing, and support match approved plans

    FBC-M 603.1
  2. Duct sealingCritical

    Verify duct joints and connections are properly sealed

    FBC-M 603.9
  3. Equipment placementCritical

    Verify air handler and condenser locations per plans with required clearances

    FBC-M 304.1
  4. Refrigerant line installation

    Match refrigerant line size, insulation, and route to approved plans; leave field-installed joints visible before cover.

    FBC-M 1107.7
  5. Return air pathway

    Show return-air path and grille or transfer opening against approved mechanical plans.

    FBC-M 601.6

Building

Phase #6

Insulation

If in scope
  1. Wall cavity insulation R-valueCritical

    Match insulation to the approved energy compliance path and plans; confirm whether this building uses the residential or commercial energy provisions.

    FBC-E R402.1.2FBC-E C402.2
  2. Ceiling/attic insulation R-valueCritical

    Match insulation to the approved energy compliance path and plans; confirm whether this building uses the residential or commercial energy provisions.

    FBC-E R402.1.2FBC-E C402.2
  3. Insulation coverage and gapsCritical

    Verify no gaps, voids, or compression in insulation installation

    FBC-E R402.4.1.1FBC-E C402.2
  4. Air sealing

    Verify air sealing at penetrations, top plates, and rim joists

    FBC-E R402.4.1.1FBC-E C402.5
Phase #7

Roof In-Progress

If in scope
  1. Drip edge installationCritical

    Verify drip edge is installed at eaves and rakes

  2. Valley and flashingCritical

    Verify valley flashing and wall flashing are properly installed

  3. Roof penetration sealing

    Verify all roof penetrations are properly sealed and flashed

  4. Covering materialCritical

    Match roof tile, shingles, or metal panels to the approved plans and product approval.

  5. Covering attachmentCritical

    Show fastener or clip pattern before it is concealed by the next course.

  6. Flashing installationCritical

    Show flashing at valleys, walls, edges, and penetrations while accessible.

Phase #8

Exterior Wall Covering (Lath / Stucco / Siding)

If in scope
  1. Wall covering material and installationCritical

    Verify exterior wall covering material matches approved plans and is properly installed

  2. Weather-resistive barrierCritical

    Verify weather-resistive barrier is properly installed behind cladding

  3. Flashing at penetrations and transitionsCritical

    Verify flashing is installed at windows, doors, and wall transitions

  4. Fastener pattern and spacing

    Verify cladding fastener type and spacing per manufacturer and plans

Phase #9

Drywall / Gypsum Board

If in scopeBD-Dependent

Most jurisdictions skip this inspection for this project type. Confirm with your building department whether they'll require it.

  1. Drywall thickness and typeCritical

    Match board type, thickness, exposure rating, and layers to the approved rated or shear assembly.

  2. Fastener spacingCritical

    Verify screw or nail spacing meets code requirements

  3. Fire-rated assembliesCritical

    Verify fire-rated walls and ceilings have proper drywall layers per rating

Electrical

Phase #10

Electrical Final

If in scope
  1. Panel complete and labeledCritical

    Verify panel cover installed, all breakers labeled, no open knockouts

    NEC 408.4NEC 408.7
  2. GFCI and AFCI operationalCritical

    Verify all GFCI and AFCI devices test and reset properly

    NEC 210.8NEC 210.12
  3. Receptacle and switch functionCritical

    Verify outlets and switches operate correctly throughout

  4. Light fixtures installed

    Verify all light fixtures are installed and operational

    NEC 210.70
  5. Exterior lighting and outletsCritical

    Where in scope, demonstrate outdoor GFCI protection and required exterior entrance lighting.

    NEC 210.8NEC 210.70

Plumbing

Phase #11

Plumbing Final

If in scope
  1. Fixture installation and operationCritical

    For fixtures in the approved scope, show level alignment, water and drainage connections, and live operation.

    FBC-P 405.3FBC-P 301.3FBC-P 301.4
  2. Water heater installationCritical

    Where a water heater is in scope, show the installed relief valve and discharge piping. For a storage-type heater, show a pan only where tank leakage would cause damage. Show the pan drain where required; a replacement needs no new pan drain if none was previously installed (FBC-P 504.7.2).

    FBC-P 504.4FBC-P 504.6FBC-P 504.7FBC-P 504.7.1FBC-P 504.7.2
  3. No visible leaksCritical

    During the live fixture run, show exposed connections and surrounding areas with no visible leaks.

  4. Hose bibbs and exterior plumbing

    Where exterior hose connections are in scope, show backflow protection and operation.

    FBC-P 608.16.4.2

Mechanical

Phase #12

Mechanical Final

If in scope
  1. System operational testCritical

    Demonstrate the installed system operating in its approved heating, cooling, exhaust, or hood mode as applicable.

  2. Air handler and condenser installationCritical

    If an air handler or condenser is in scope, show installed equipment, clearance, support, and manufacturer labels.

    FBC-M 304.1
  3. Condensate drainCritical

    Where cooling equipment produces condensate, show the drain and approved termination.

    FBC-M 307.2
  4. Duct registers and grilles

    Show supply and return openings and demonstrate airflow at representative locations.

    FBC-M 603.18
  5. Equipment labels and data plates

    Match installed equipment model and rating to approved plans and manufacturer instructions.

    FBC-M 304.1

Building

Phase #13

Building Final

Typical Final
  1. Egress doors and hardwareCritical

    Verify egress doors provide minimum 32-inch clear width and proper hardware

  2. Smoke alarms installed and operationalCritical

    Show required smoke alarms in affected dwelling units and demonstrate operation.

  3. CO alarms installedCritical

    Verify carbon monoxide alarms where required

  4. Emergency escape openingsCritical

    Verify bedroom windows meet egress size requirements

  5. Stairway complianceCritical

    Verify stair rise, run, handrail height, and landing dimensions

  6. Address numbers visible

    Verify address numbers are posted and visible from street

  7. Exterior finishes complete

    Verify exterior cladding, trim, and weatherproofing are complete

  8. Site grading and drainage

    Show finished grading and drainage against approved site plans; no universal 6-in-10-ft rule.