- #01Plan and document coordination
Obvious clerical, title-block, sheet-index, permit-description, or cross-sheet inconsistencies visible in the submitted documents. A Courtesy Comment on these items does not cause FCC to fail or return the plan set unless the same condition also creates a building-code compliance issue within FCC's review scope.
FBC-B 107.2.1 - #02Zoning and site coordination
Apparent setback, lot-coverage, use, or site-dimension conflicts visible in the submitted plans that could cause the plans to fail Planning and Zoning review. Planning and Zoning makes the zoning and lot-compliance determination. The absence of a Courtesy Comment is not approval of those separate requirements.
- #03Floodplain coordination
Apparent inconsistencies or missing coordination in flood-zone, design-flood-elevation, finished-floor, or flood-opening information shown on the plans that could cause the plans to fail floodplain review. The floodplain administrator makes the determination. The absence of a Courtesy Comment is not approval of those separate requirements.
- #04Fire-authority coordination
Apparent separately reviewed fire alarm, sprinkler, hood-suppression, smoke-control, or similar coordination issues visible on the plans that could cause the plans to fail fire review. The fire marshal makes the determination. The absence of a Courtesy Comment is not approval of those separate requirements.
Single Family Aluminum
Screen enclosures, pool cages, carports, aluminum pergolas on existing footings
Last updated: Sep 29, 2026
Section 1
Required Documents
Submit these with your initial project package.
Always required
- Construction PlansConstruction plans showing aluminum structure layout and framing. Plans prepared by a Florida-registered architect or engineer carry that professional's seal. Plans prepared by a contractor or owner are accepted without a seal unless Florida law or the building department requires professional plans.
Conditional
- Site Plan / SurveySite plan or survey showing property boundaries, setbacks, and structure footprint.WhenA survey or site sketch showing where the structure sits; a sheet in the plans counts. Not needed to start review.
Courtesy screen
Courtesy screen on every plan review
Every plan FCC reviews receives a limited courtesy screen for the items below when they are reasonably visible in the submitted documents. If we see an apparent issue that could cause the plans to fail review by another agency, we will identify it as a Courtesy Comment. Courtesy Comments alone do not cause FCC to fail or return the plan set unless the same condition also creates a building-code compliance issue within FCC's review scope. The responsible agency makes the final determination—for example, Planning and Zoning for setbacks, lot coverage, use, and other lot-compliance matters. The absence of a Courtesy Comment is not approval of those separate requirements.
Section 2
Approval criteria for this project type
These are the building-code criteria FCC uses to determine the plan-review result. An unresolved item may be issued as a Required Correction and cause the plan set to be returned for correction.
BuildingRequired
- #01Design wind speed & exposureLife Safety
Verify design wind speed (Vult) and exposure category match jurisdiction requirements for the project location.
FBC-B 1609FBC-B 2002ASCE 7-22 - #02Attachment to existing structureLife Safety
Verify connection details between the aluminum structure and the existing residence are shown with adequate fastener specifications.
FBC-R R301.1FBC-B 2002.4 - #03Footing design (if new footing)Life Safety
If scope includes new footings, verify footing dimensions, reinforcement, and depth are shown.
FBC-R R403 - #04Florida product approvalsCode
Verify Florida product approvals (statewide FL#, Miami-Dade NOA, or local approval under F.S. 553.8425) are listed for each product subject to Florida product approval (F.S. 553.842 and 553.8425; Rule 61G20-3 F.A.C.).
F.S. 553.842F.S. 553.8425Rule 61G20-3 F.A.C. - #05Egress from enclosed areaCode
If the aluminum structure encloses an egress path from a sleeping room or dwelling unit, verify egress is maintained.
FBC-R R310FBC-R R311 - #06Engineer of record seal on structural, when engineeredDocumentation
When a Florida engineer prepared the structural drawings, confirm the document carries that engineer's current seal and signature.
Florida Statutes Chapter 471FBC-B 107.3.5
Section 3
Inspection Walkthrough
Inspections are listed in their typical phase order. Your own inspection list comes from your approved plans. Inspections marked “If in scope” apply only when your plans include that work. Call (772) 222-6679 with questions.
Building
Building Final
Typical Final- Base rail attachment and tapcon spacingCritical
Verify base rail is secured with tapcons at correct spacing per plans
- Post to base connectionCritical
Verify structural connection of posts to base rail
- Post to roof beam connectionCritical
Verify structural connection of posts to roof beams
- Gusset connectionsCritical
Verify gusset plates are installed at structural joints per plans
- Beam to gutter connectionCritical
Verify beams are properly connected to gutter system
- Gutter clips
Verify gutter clips are installed at proper intervals
- Overall structureCritical
Verify overall shape and construction matches approved plans
- Pool-barrier gate operation, if applicable
If this enclosure is the approved pool barrier, demonstrate the gate opens away from pool and self-closes and self-latches.
ISPSC 305.3 - Pool equipment bonding
If pool equipment is present, verify bonding wire at pool equipment and at structure
NEC 680.26 - Elite roof panel sealing
If elite (solid) roof panels are present, verify sealing is complete