- #01Plan and document coordination
Obvious clerical, title-block, sheet-index, permit-description, or cross-sheet inconsistencies visible in the submitted documents. A Courtesy Comment on these items does not cause FCC to fail or return the plan set unless the same condition also creates a building-code compliance issue within FCC's review scope.
FBC-B 107.2.1 - #02Zoning and site coordination
Apparent setback, lot-coverage, use, or site-dimension conflicts visible in the submitted plans that could cause the plans to fail Planning and Zoning review. Planning and Zoning makes the zoning and lot-compliance determination. The absence of a Courtesy Comment is not approval of those separate requirements.
- #03Floodplain coordination
Apparent inconsistencies or missing coordination in flood-zone, design-flood-elevation, finished-floor, or flood-opening information shown on the plans that could cause the plans to fail floodplain review. The floodplain administrator makes the determination. The absence of a Courtesy Comment is not approval of those separate requirements.
- #04Fire-authority coordination
Apparent separately reviewed fire alarm, sprinkler, hood-suppression, smoke-control, or similar coordination issues visible on the plans that could cause the plans to fail fire review. The fire marshal makes the determination. The absence of a Courtesy Comment is not approval of those separate requirements.
Single Family Mobile Home Replacement
Replace an existing HUD-manufactured mobile home on its site and inspect the new setup and tie-downs.
Last updated: Sep 29, 2026
Section 1
Required Documents
Submit these with your initial project package.
Conditional
- Site plan or surveyA site drawing showing the home's location and the proposed installation work.WhenYou have a site drawing showing where the home will sit and the installation work. A separate survey is not required because of this label; a site plan that shows the location is acceptable.
- Home installation and foundation documentsManufacturer installation information and any project-specific foundation, support, tie-down, or anchoring details.WhenYour package includes the manufacturer's installation information or project-specific foundation, support, tie-down, or anchoring details. Combined documents count. The manufacturer manual does not always replace project engineering; FCC will confirm what applies.
Courtesy screen
Courtesy screen on every plan review
Every plan FCC reviews receives a limited courtesy screen for the items below when they are reasonably visible in the submitted documents. If we see an apparent issue that could cause the plans to fail review by another agency, we will identify it as a Courtesy Comment. Courtesy Comments alone do not cause FCC to fail or return the plan set unless the same condition also creates a building-code compliance issue within FCC's review scope. The responsible agency makes the final determination—for example, Planning and Zoning for setbacks, lot coverage, use, and other lot-compliance matters. The absence of a Courtesy Comment is not approval of those separate requirements.
Section 2
Approval criteria for this project type
These are the building-code criteria FCC uses to determine the plan-review result. An unresolved item may be issued as a Required Correction and cause the plan set to be returned for correction.
BuildingConditional review scope
- #01Footing / foundation designLife Safety
Footing or foundation design must show dimensions, reinforcement, depth, and connection to the structure above.
FBC-R R403FBC-B 1809 - #02Attachment to existing structureLife Safety
Connection details between the new work and the existing structure must show fastener type, spacing, and embedment.
FBC-R R301.1 - #03Plan review applicability (FBC 107.3.5)Documentation
Per FBC-B 107.3.5, replacing a manufactured home involves foundations and tie-downs (Exemption #6 carveout). FCC performs this review only when the building department requires plan review or the client opts in.
FBC-B 107.3.5
MechanicalRequired
- #01Combustion air and ventingLife Safety
Fuel-fired equipment requires combustion air and proper venting per FBC-M 303 / 804.
FBC-M 303FBC-M 804FBC-FG 304.1FBC-FG 503 - #02Construction-document clarity — mobile home mechanical connectionsDocumentation
The submitted documents must clearly identify the site-built mechanical connections for the replacement manufactured home so FCC can review this mandatory single-family mechanical trade as part of the one residential plan review.
FBC-B 107.2.1
ElectricalRequired
- #01Service size and load calculationCode
Electrical service and feeder sizing supported by NEC Article 220 load calculation.
NEC 220NEC 230 - #02Construction-document clarity — mobile home electrical serviceDocumentation
The submitted documents must clearly identify the electrical service connections for the replacement manufactured home so FCC can review this mandatory single-family electrical trade as part of the one residential plan review.
FBC-B 107.2.1
Items marked Conditional review scope are non-blocking. Per FBC 107.3.5, plan review isn't required for these scopes — FCC reviews them when the building department requests it or the client wants the extra set of eyes.
Section 3
Inspection Walkthrough
Inspections are listed in their typical phase order. Your own inspection list comes from your approved plans. Inspections marked “If in scope” apply only when your plans include that work. Call (772) 222-6679 with questions.
Building
Manufactured Building / Tie-Down
- Anchor and strap installationCritical
Verify ground anchors and tie-down straps are installed against approved manufacturer setup and engineered plans
FBC-B 110.3 - Anchor spacing and countCritical
Verify number and spacing of anchors match approved setup and anchorage design
FBC-B 110.3 - Strap tension and connectionCritical
Verify straps are connected and tensioned against approved setup instructions
FBC-B 110.3 - Pier and pad conditionCritical
Verify piers and pads are placed and supported against approved foundation details
FBC-B 110.3
Electrical
Electrical Final
- Panel complete and labeledCritical
Verify panel cover installed, all breakers labeled, no open knockouts
NEC 408.4 - GFCI and AFCI operationalCritical
Verify all GFCI and AFCI devices test and reset properly
NEC 210.8NEC 210.12 - Receptacle and switch functionCritical
Operate affected receptacles and switches in this permit and show completed connections.
FBC-B 110.3 - Light fixtures installed
Verify all light fixtures are installed and operational
NEC 210.70 - Exterior lighting and outletsCritical
Where this permit changes exterior lighting or outlets, show operation and required GFCI protection.
NEC 210.8NEC 210.70
Plumbing
Plumbing Final
If in scopeBD-DependentMost jurisdictions skip this inspection for this project type. Confirm with your building department whether they'll require it.
- Site plumbing connectionCritical
Show the approved water and drain connections between the factory-built home and site utilities.
FBC-B 110.3 - Leak and operation testCritical
Show applicable system test results, then demonstrate site connections operating with no visible leaks.
FBC-P 312.1
Mechanical
Mechanical Final
- System operational testCritical
Demonstrate only the permitted mechanical system operating per approved design and manufacturer instructions.
- Air handler and condenser installationCritical
Where air handler or condenser equipment is in scope, verify installation, access and clearances against approved plans and manufacturer instructions.
FBC-M 304.1 - Condensate drainCritical
Verify condensate drain is properly routed and terminated
FBC-M 307.2 - Duct registers and grillesCritical
Where ducts are in scope, show representative installed registers and grilles per manufacturer instructions.
FBC-M 603.18 - Equipment labels and data plates
Show equipment nameplates and compare capacity and efficiency to the approved schedule.
Building
Building Final
Typical Final- Egress doors and hardwareCritical
Verify egress doors provide minimum 32-inch clear width and proper hardware
FBC-R R311.2 - Smoke alarms installed and operationalCritical
Verify smoke alarms in each bedroom, outside sleeping areas, and each level
FBC-R R314.3 - CO alarms installedCritical
Verify carbon monoxide alarms where required
FBC-R R315.1 - Emergency escape openingsCritical
Verify bedroom windows meet egress size requirements
FBC-R R310.1 - Stairway complianceCritical
Verify stair rise, run, handrail height, and landing dimensions
FBC-R R311.7 - Address numbers visible
Verify address numbers are posted and visible from street
FBC-R R319.1 - Exterior finishes complete
Verify exterior cladding, trim, and weatherproofing are complete
FBC-R R703.1 - Site grading and drainage
Verify finish grade slopes away from foundation minimum 6 inches in 10 feet
FBC-R R401.3