- #01Plan and document coordination
Obvious clerical, title-block, sheet-index, permit-description, or cross-sheet inconsistencies visible in the submitted documents. A Courtesy Comment on these items does not cause FCC to fail or return the plan set unless the same condition also creates a building-code compliance issue within FCC's review scope.
FBC-B 107.2.1 - #02Zoning and site coordination
Apparent setback, lot-coverage, use, or site-dimension conflicts visible in the submitted plans that could cause the plans to fail Planning and Zoning review. Planning and Zoning makes the zoning and lot-compliance determination. The absence of a Courtesy Comment is not approval of those separate requirements.
- #03Floodplain coordination
Apparent inconsistencies or missing coordination in flood-zone, design-flood-elevation, finished-floor, or flood-opening information shown on the plans that could cause the plans to fail floodplain review. The floodplain administrator makes the determination. The absence of a Courtesy Comment is not approval of those separate requirements.
- #04Fire-authority coordination
Apparent separately reviewed fire alarm, sprinkler, hood-suppression, smoke-control, or similar coordination issues visible on the plans that could cause the plans to fail fire review. The fire marshal makes the determination. The absence of a Courtesy Comment is not approval of those separate requirements.
Single Family Re-Roof
Replace a residential roof covering and inspect dry-in, conditional deck work, and the completed roof.
Last updated: Sep 29, 2026
Section 1
Required Documents
Submit these with your initial project package.
Always required
- Product Approvals / NOAsNOAs or Florida product approvals for applicable materials (roof covering, and underlayment where it has one).
Conditional
- Roof Report (Roofr, EagleView, etc.)Roof measurement report from Roofr, EagleView, or a similar service showing roof planes, dimensions, slopes, and area.WhenOptional. Nice to have; FCC can use an aerial map view of the roof. Not needed to start review.
Courtesy screen
Courtesy screen on every plan review
Every plan FCC reviews receives a limited courtesy screen for the items below when they are reasonably visible in the submitted documents. If we see an apparent issue that could cause the plans to fail review by another agency, we will identify it as a Courtesy Comment. Courtesy Comments alone do not cause FCC to fail or return the plan set unless the same condition also creates a building-code compliance issue within FCC's review scope. The responsible agency makes the final determination—for example, Planning and Zoning for setbacks, lot coverage, use, and other lot-compliance matters. The absence of a Courtesy Comment is not approval of those separate requirements.
Section 2
Approval criteria for this project type
These are the building-code criteria FCC uses to determine the plan-review result. An unresolved item may be issued as a Required Correction and cause the plan set to be returned for correction.
BuildingConditional review scope
- #01Deck attachment scheduleLife Safety
Roof deck (sheathing) fastener schedule must be shown or referenced, particularly when re-nailing is required by the jurisdiction.
FBC-R R803FBC-EB 706 - #02Secondary water barrier (HVHZ / jurisdiction requirement)Life Safety
Verify secondary water barrier is specified when required by the jurisdiction or when applying HVHZ provisions.
FBC-EB 706.7.2FBC-B 1518.2 - #03Florida product approval for roof coveringCode
Verify Florida product approval (statewide FL#, Miami-Dade NOA, or local approval under F.S. 553.8425) is listed for the new roof covering, matching the project's wind zone.
F.S. 553.842F.S. 553.8425Rule 61G20-3 F.A.C.FBC-B 1504FBC-R R905 - #04Underlayment specificationCode
Underlayment type and layers must be specified consistent with the roof covering and jurisdictional wind speed.
FBC-R R905.1.1FBC-B 1507 - #05Plan review applicability (FBC 107.3.5 exemption)Documentation
Per FBC-B 107.3.5, plan review is not required for re-roofs. FCC performs this review only when the building department requires plan review or the client opts in. Product approvals and installation requirements are typically verified at inspection.
FBC-B 107.3.5
Items marked Conditional review scope are non-blocking. Per FBC 107.3.5, plan review isn't required for these scopes — FCC reviews them when the building department requests it or the client wants the extra set of eyes.
Section 3
Inspection Walkthrough
Inspections are listed in their typical phase order. Your own inspection list comes from your approved plans. Inspections marked “If in scope” apply only when your plans include that work. Call (772) 222-6679 with questions.
Building
Roof Sheathing
If in scopeBD-DependentMost jurisdictions skip this inspection for this project type. Confirm with your building department whether they'll require it.
- Roof sheathing attachmentCritical
Verify roof deck nailing pattern and edge spacing per the approved nailing schedule.
- Roof sheathing material and thicknessCritical
Verify roof sheathing panel material, thickness, and span rating match the approved plans.
- Panel gap spacing at roof deck
Verify proper edge gap between roof sheathing panels per the panel manufacturer.
- Deck edge and field fasteningCritical
Show the fastening pattern at panel edges and in the field before dry-in.
- Damaged deck replacementCritical
Replace unsound panels before the deck is covered.
Roof Dry-In
- Underlayment installationCritical
Verify roof underlayment type and installation per code and manufacturer specs
FBC-R R905.1.1 - Deck conditionCritical
Verify roof deck is in acceptable condition and any damaged sheathing has been replaced
FBC-R R803.1
Roof In-Progress
If in scope- Drip edge installationCritical
Verify drip edge is installed at eaves and rakes
FBC-R R905.2.8.5 - Valley and flashingCritical
Verify valley flashing and wall flashing are properly installed
FBC-R R903.2 - Roof penetration sealing
Verify all roof penetrations are properly sealed and flashed
FBC-R R903.2 - Covering materialCritical
Match roof tile, shingles, or metal panels to the approved plans and product approval.
- Covering attachmentCritical
Show fastener or clip pattern before it is concealed by the next course.
- Flashing installationCritical
Show flashing at valleys, walls, edges, and penetrations while accessible.
Roof Final
Typical Final- Roofing material installationCritical
Verify roofing material is installed per manufacturer specs and approved plans
FBC-R R905.1 - Flashing completenessCritical
Verify all flashing is complete at walls, valleys, penetrations, and edges
FBC-R R903.2 - Ridge vent or ventilation
Verify roof ventilation is installed per plans
FBC-R R806.1 - Nailing pattern complianceCritical
For systems with field fasteners, compare in-progress attachment photos with the approved product instructions.
FBC-R R905.1 - Cleanup and debris removal
Verify job site is clean with no exposed nails or debris in gutters